Model |
PSJ1200-200 |
PSJ1400-315 |
PSJ1400-400 |
PSJ1800-630 |
PSJ1800-800 |
Main motor power (kW/HP) | 200/272 | 315/428 | 400/544 | 630/857 | 800/1088 |
Operating voltage | 380V | 380V | 380V | 380V | 6KV/1OKV |
Starting method | Soft start/frequency conversion (optional) | Soft start/frequency conversion (optional) | Soft start/frequency conversion (optional) | Soft start/frequency conversion (optional) | Liquid resistance cabinet |
Recommended transformer capacity (kVA) | 400 (soft start)/250 (frequency conversion) | 630(soft start)/500(variable frequency) | 800(soft start)/630(variable frequency) | 1000(soft start)/800(variable frequency) | 1250 |
Reference capacity (t/h) | 3-5 | 5-9 | 6-10 | 9-15 | 12-20 |
Default sieve hole size (mm) | 60 round hole
(60x70 square hole optional) |
60 round hole
(60x70 square hole optional) |
60 round hole
(60x70 square hole optional) |
60 round hole
(60x70 square hole optional) |
70x90 square hole |
Reference weight (t) | 33 | 37 | 40 | 70 | 75 |
Maximum working diameter of rotor(mm) | 1072 | 1072 | 1166 | 1560 | 1560 |
Number of hammer heads | 8 | 10 | 10 | 12 | 12 |
Weight of single hammer head (kg) | 40 | 40 | 40 | 80 | 80 |
Crushing cavity width (mm) | 1200 | 1400 | 1400 | 1800 | 1800 |
Box opening length (m) | 3 | 3 | 3 | 3 | 3.5 |
Climbing belt (width-length) | B800x4.5m (half pit)
B800x8m (full pit) |
B800x4.5m (half-ground pit)
B800x8m (full-ground pit) |
B800x4.5m(Half pit)
B800x8m(Full pit) |
B1000-6m(Half pit) | B1000x6m(Half pit) |
Outfeed belt (width-length) | B800x7m | B800x9m | B800x9m | B800x10m | B1000x12m |
Garbage discharging belt (width-length) | B500x7m | B500x7m | B500x7m | B600-8m | B600x8m |
Note: We may update the technical parameters and shape due to constant technical upgrading without a prior notice.
ZONKIN’s high quality products remove all your worries,Key parts come with alarm devices: Worry-free and convenient,After-sales services are supervised by General Manager in person to best ensure service quality
Choke machine can rotate either forward or backward with a short processing time,Simple installation: It can be put into production normally after 2-day installation & commissioning
One person is required only for feeding which is controlled automatically
Compared with traditional shredder, it saves about 30% (including length) of occupied floor area
Start at variable frequency at low starting current to reduce the installed power of the transformer and save landline fee
Strictly follow the top-level engineering machinery research and development process to develop products, and undergo rigorous in factory testing.
All use high-quality components from top tier construction machinery in large quantities.
Experienced assembly personnel from top engineering machinery assemble the entire process.
Strictly follow the top-level engineering machinery inspection regulations and rigorously control every process.
Sales hotline+86-15573123666
Copyright © 2021 Changsha ZONKIN Intelligent Equipment Co., Ltd. Address: Huiyi Industrial Park, No. 1322, Kaiyuan East Road, Changsha City, Hunan Province Technical Support: wangluocloud.com